The concrete pad has been poured
The SGSLR shelter after installation
The dome passes Factory Acceptance Testing (FAT)
Sea container with dome parts
Work on the shelter continues to progress
The shelter is ready to receive the dome
The Baader Planetarium team began to assemble the dome
Dome assembly continues
The dome ring is lifted to be placed on the shelter
The dome is lifted onto the shelter
The shelter with its brand new dome
The dome passes site acceptance testing (SAT)